Illuminated pool with a wooden edge at sunset

Pool blog

Pools, Useful tips

Panel pool: how it is built, how long it takes and how much it costs (RockPool and Royal)

Structure of a RockPool panel pool made of white concrete panels with buttresses, set on the slab
Structure of a RockPool panel pool made of white concrete panels with buttresses, set on the slab
A RockPool concrete panel pool set on the slab.

Short answer: a panel pool uses ready-made walls on a slab, without formwork. At Acuático there are two systems: RockPool concrete panels, from 6,997 € to 27,305 € without installation, and Royal galvanised steel panels, from 5,750 €. The RockPool panels go up in 5–12 working days and the Royal structure in 2–3 days. The product sheets do not give a total time for the whole job.

Here you will see, first, what a panel pool is and how it is built. Then come how long it takes, how much it costs and how it differs from a concrete pool and from an EPS block pool. In addition, the numbers come from the product sheets, the categories and our already approved articles. So when there is no figure, we do not invent one.

What a panel pool is and which systems there are

Short answer: it is a pool whose walls arrive ready-made, in panels that you bolt together on site. The concrete panel pool is the RockPool, and the Royal has steel panels with a liner.

  • RockPool: a patented Italian system of self-supporting concrete panels, 1.5 cm thick. It needs no formwork and no poured walls, and its shape, size and depth are designed to measure.
  • Royal: a metal frame with galvanised steel panels of 1.5 mm and supports, and a liner of 1.5–1.6 mm that you choose from 25 designs. All the models are rectangular and 1.50 m deep, and you install them fully in the ground.

So, the Royal is not made of concrete. Its walls are steel and the lining is a liner. You will find the models in the categories of RockPool concrete panel pools and of Royal panel pools.

How a concrete panel pool is built

Short answer: you dig, pour a slab, lift the panels by hand and bolt them together. Then comes the waterproofing and the lining.

  1. First, the excavation and the reinforced concrete slab: leave at least 30 cm of free space around the walls and, in an overflow pool, 65 cm. The customer pays for them.
  2. Then, marking out and guide battens: you nail battens along the marked outline, and the panels go along them.
  3. Next, the panels: you lift each panel, of about 70–80 kg, by hand, level it, anchor it to the slab and bolt it to the next one. Also, a sealant goes in the joint.
  4. Buttresses: the Small ones have reinforcement and concrete, and the Unic and Full ones use only bolts and anchors.
  5. After that, the stairs and benches: you fit them with ready-made concrete blocks.
  6. Then, the support plates and the edge: you glue the plates on the panels, and on them goes the pool edge or the overflow edge.
  7. Finally, the lining: tape on the joints, waterproofing and a lining of your choice, whether liner, mosaic or ceramic.

To see the rest of the work, read the article on how to build a pool.

How long it takes to install a panel pool

Short answer: the RockPool concrete panels are installed in 5–12 working days, but supplying the materials takes 15–30 working days. The Royal structure goes up in 2–3 days.

RockPool stageTime
Quotation, 3D project and ordera few days
Supply of the materials15–30 working days
Excavation and slabthe customer's job, in parallel with the supply
Drain and pipesup to 2 working days
Panel installation5–12 working days
Waterproofing6–14 working days
Built-in parts: skimmers, nozzles3–8 working days
Connection to the filtration system2–5 working days
Lining and grouting7–15 working days
Testing, start-up and training1–2 working days

The crews work at temperatures above 10 °C and without rain. In addition, the timescales do not count days with bad weather. On the other hand, for the Royal the sheet gives only the time of the structure, 2–3 days, on ground with a concrete surface at the bottom.

Panel pool price: RockPool

Short answer: from 6,997 € for the RockPool OHIO, of 4.00 × 3.00 m, to 27,305 € for the RIVIERA, of 12.00 × 6.00 m. The price is indicative: it includes the basic options and does not include installation.

ModelSizeFiltrationPrice from
OHIO4.00 × 3.00 m7 m³/h6,997 €
LEMOND5.00 × 3.50 m9 m³/h9,156 €
BALTIMOR6.50 × 3.50 m11 m³/h11,086 €
LAGOON7.50 × 3.00 m11 m³/h11,087 €
ANTRIUM8.50 × 4.50 m11 m³/h16,374 €
LENOX10.00 × 4.00 m17 m³/h17,100 €
RIVIERA12.00 × 6.00 m27 m³/h27,305 €

The prices include VAT and are from 18/11/2026, they may change. In addition, there are two other models: VENERA, of 9.00 × 7.00 m and 24,376 €, and FIESTA, of 11.00 × 5.50 m and 23,651 €. All the models in the category are 1.50 m deep.

The price does not include transporting the materials to the site, the excavation or the slab. Nor does it include the interior stairs, the pool edge or the water effects. You pay in four instalments: 50 %, 20 %, 20 % and 10 %. In addition, with the quotation you get a free 3D project, and the "Design your pool" calculator gives you a figure straight away.

Panel pool price: Royal

Short answer: from 5,750 € for the Royal 0 DL, of 5.00 × 3.00 m, and from 12,620 € for the Royal 6 DL, of 12.00 × 6.00 m. The price does not include installation.

ModelSizeVolumeFiltrationPrice from
Royal 0 DL5.00 × 3.00 m21 m³6–7 m³/h5,750 €
Royal 1 DL6.00 × 3.00 m26 m³6–7 m³/h6,350 €
Royal 2 DL7.00 × 3.50 m35 m³6–7 m³/h6,900 €
Royal 3 DL8.00 × 4.00 m46 m³9 m³/h7,740 €
Royal 4 DL9.00 × 4.50 m58 m³11 m³/h8,970 €
Royal 5 DL10.00 × 5.00 m73 m³14–16 m³/h10,800 €
Royal 6 DL12.00 × 6.00 m99 m³21 m³/h12,620 €

The price depends on the liner series and the stairs you choose. In addition, the installation price depends on the town, and you can ask our adviser for a quotation. The warranty on the walls, the structure and the liner is 5 years, and on the rest of the equipment, 2 years.

For safety, the manufacturer asks you to place the pump and the electrical equipment at least 3.5 m from the pool wall, with residual-current protection. In addition, you must install every Royal pool fully in the ground.

Panel pool or concrete pool: the differences

Short answer: a concrete pool built to a project allows any shape, but it takes months. A panel pool arrives prefabricated and the work is faster. An EPS block pool is built with blocks that are filled with concrete.

SystemWhat the walls are likeTimePrice from
Concrete built to a projectany shape, colour and sizethe work lasts monthsby project
RockPool concrete panelsprefabricated panels that are bolted together, no formworkpanels in 5–12 working days6,997 €
Royal steel panelsgalvanised steel panels with a liner, rectangular onlystructure in 2–3 days5,750 €
NewStyle EPS blockspolystyrene blocks filled with concretematerials in 15–30 working days6,260 €

However, the details of the other two options are in the article on the polystyrene pool and in the one on how much it costs to build a pool. If you prefer a ready-made shell, the fibreglass pool starts at 11,980 €. Finally, concrete pools built to a project are in the category of concrete pools.

Frequently asked questions about the panel pool

What is a concrete panel pool?

It is a pool with walls of ready-made concrete panels, such as the RockPool. You anchor them to the slab and bolt them together.

How much does a prefabricated panel pool cost?

The RockPool models go from 6,997 € to 27,305 € without installation, and the Royal ones start at 5,750 €. The prices are from 18/11/2026.

Is a panel pool or a concrete pool better?

A concrete pool allows any shape, but it takes months. In contrast, a panel pool uses prefabricated panels and needs no formwork.

How long does it take to install a panel pool?

The RockPool panels take 5–12 working days, and the Royal structure takes 2–3 days. In addition, you must count the supply of the materials.

In short, you now know how a panel pool is built, how long it takes and how much it costs. You will find all the models in our pool shop Acuático.